PHOTO OFFICIAL ANNOUNCEMENT Romania has exceeded the psychological threshold for the number of kilometers of highway and expressway

--

Romania has, as of today, more than 1,091 km of highway and express road in circulation, announced the Minister of Transport.

Currently, contracts for the construction of another 729 km of high-speed road are being implemented (design and execution) and contracts for another 203 km have been tendered.

READ ALSO VIDEO New aerial images from the Moldova Highway. Where did Umbrărescu’s workers arrive, with a “battalion” of machines

Traffic on the Expressway that provides the connection between the Oradea Ring Road and the Transilvania Highway was opened today.

The road, 19 km long, cost 546 million lei (without VAT).

PHOTO The construction of a new high-speed road has secured financing READ ALSO PHOTO The construction of a new high-speed road has secured financing

The general director of CNAIR confirmed that, in the future, this road sector will be added to the Arad-Oradea expressway on the high-speed corridor that will ensure the road connection between the Baltic Sea, the Black Sea and the Adriatic Sea.

Pistol also states that, for the execution of the Arad – Oradea Expressway (121 km), the contract was launched in the auction and is now in the phase of preparing offers.

The article is in Romanian

Romania

Tags: PHOTO OFFICIAL ANNOUNCEMENT Romania exceeded psychological threshold number kilometers highway expressway

-

PREV A two-year-old child fell into a fishing pond while his parents were barbecuing
NEXT A man from Cluj refused to pay 24,000 euros to the craftsmen. He renovated his studio in Cluj by himself. How much did it cost?