The Infrastructure and Services Department of the Bistrita City Hall has scheduled this week, April 1-5, a series of repair works, improvements and interventions in the city.
The works announced by the municipality:
Street maintenance
• Current repair work:
– Cireșului entrance – ground parking arrangement
– Pajiștei str. – ecological parking layout with grid tiles
– Piața Mică – road repairs with andesite slabs
• Ditch cleaning works: Secundara str. no. 5 – Sigmir; Lempeș – Bistrita
• Painted metal parapets: the bridge on Petru Maior Street and Drumul Cetății
• Maintenance works on cobbled streets: Viile cu Pomi, Pomilor str., Mareșal Leonida Pop str.
• Repair work after interventions on water-sewer, electrical networks
Property maintenance and urban furniture
• Repairs:
– Grigore Moisil Technological High School – exterior repairs
– Avram Iancu Secondary School – evacuated bridge goods
– Schullerwald Forest – exterior repairs
• Works of washing public monuments
• Smooth parapet washing works
• Works to repair the Han artesian well
• Maintenance works: road signs, trash cans, benches, metal railings to prevent car access, playgrounds, lane dividers
Green spaces
• Ornamental shrub planting works: B-dul. General Grigore Balan
• Manual digging of pits for tree planting: Andrei Mureșanu str., Năsăudului str.
• Trees planted: Andrei Mureșanu str., Năsăudului str
• Cuttings in tree crowns: B-dul Decebal, Pedestrian Liviu Rebreanu
• Loaded branches: B-dul. Decebal, Pedestrian Liviu Rebreanu
• Mowing works: B-dul. Republicii, Strand Municipal Codrișor
• Washed banks: Central Square
• Sanitized playgrounds
• Unforeseen works
Deratization, disinsection, disinfection
• External rodent control works (channels): Sucevei Street, Muncelului Entrance, Emil Gârleanu Street, Bârgăului Street, Grănicerilor Street, Calea Moldovei, 1 Decembrie Street, Greuceanu Street, Basmului Street, Voinicelului Street, Merilor Street, Prâiașului Alley
• External extermination works (mouse bait checks)
• Interior disinsection works: Center for accommodation of homeless people, Theoretic Sanitary High School
Thermal power plants, installations
• Monitoring, maintenance and operation of hot water boilers and wall heating plants
• Wastewater level monitoring at the fuel house
• Traffic light operation check
• Maintenance of skimmer installations and water gloss pumps: King Mihai I Park
• Checked installations: King Mihai I Park, Viișoara Park, Schullerwald Forest, Unirea Dendrological Park, Scuar Subcetate
• Changed water for oxygenation of water gloss: King Mihai I Park
• External hydrant electric pump revisions: Schullerwald Forest
• Checked and repaired sanitary installations: Community Center for Youth
• Repaired internal sewage installation: Night center and accommodation for homeless people
• Revisions, repairs of artesian wells and boots: Panait Cerna str., Albert Berger str., Piaţa Dominicană
• Sanitary installation repair works: Grădiniţa Ghinda
Sanitation
• Works based on the personal lease contract for cleaning on the banks of the Bistrita river, the banks of the streams and guard ditches, concluded with the Bistrita Penitentiary
• The left bank and the right bank of the Bistrita river in the Unirea component locality, in the area of the access bridge to the airfield, have been sanitized.
• Sanitized the banks of the Valea Căstăilor stream on the section between Drumul Cetății street and the Bistrita river
• Sanitized the green spaces related to the disused railway between Drumul Cetății street and Industriei street
• Sanitized green spaces on Ion Căianu Street in the vicinity of the road bridge on Sigmirului Street
Tags: works Bistrita week Infrastructure Directorate TimpOnline .ro
-