Park in Sector 6 with urban forest and outdoor work spaces | Radio Bucharest FM – Radio Music Live Online

Park in Sector 6 with urban forest and outdoor work spaces | Radio Bucharest FM – Radio Music Live Online
Park in Sector 6 with urban forest and outdoor work spaces | Radio Bucharest FM – Radio Music Live Online
--

As of today, the residents of Sector 6 and beyond have another 3.5 hectares of brand new park, with a length of 580 meters.

On Florii Day, the second portion of Liniei Park was inaugurated, and thousands of people came to the inauguration.

Last year, on June 1, the first phase was inaugurated, 630 meters long and spread over 4.5 hectares. The entrance is from Str. Lujerului, between Plaza Mall and Cora Lujerului.

And today, the second phase was put into use, between Cotroceni Station and Doina Cornea Blvd.

It has a length of 580 meters and an area of ​​3.5 hectares, of which one hectare is occupied by an urban forest.

Ciprian Ciucu, the mayor of Sector 6: “It is the largest park opened in Bucharest, after the Revolution. There are many attractions here, new playgrounds and original relaxation spaces, a bike path of about 1.5 km, including an urban forest. Only in Phase 2 we planted 1,500 trees”.

Liniei Park has now reached over 8 hectares, and the entire investment cost 15 million lei including VAT.

The new piece of park, inaugurated today, contains:

– 585 meter cycle track, following the one in the first phase;

– an urban forest of 1 ha, with 900 trees: firs, pines, lindens, acacias, plums, tulip trees, etc.

– 2,500 shrubs and thousands of flowers;

– the surface of the green space is 5,093 m2, with an automated irrigation system;

– on a piece of 5,000 square meters, which was named Line II bis, only alleys surrounded by green space were arranged;

– pump track (267 sqm); drydeck well (64 sq m); playgrounds; fitness and hammock area; 5 smart gazebos, equipped with sockets and WiFi; 4 metal pergolas, with relaxation spaces; banks of several types; ecological boots and toilets; 6 bicycle racks, with 5 seats each; in the first phase there are another 20 places, computer panel.

The article is in Romanian

Tags: Park Sector urban forest outdoor work spaces Radio Bucharest Radio Music Live Online

-

PREV How the ballots will look in Bucharest. The Electoral Office has established the order in which the candidates appear in the June 9 elections
NEXT Florin Piersic, visited at the hospital by Ciolacu and Rafila. Doctors report that the actor is mobilizing and is in good mental health